Diagrams for illustration purposes only. For complete installation details, see installation and operation manuals for each model below.

APURE35PLG Installation

Installation and Operation Manual for APURE35PLG (7.6 MB)

1. Mount power pack to wall bracket

2. Plug in power pack

3. Drill holes into pipe for cell and pod

4. Connect locking clamps

5. Attach pod cap and electrode bell to clamps

6. Place and tighten locking rings

7. Insert flow switch into pod and attach color-coded cell leads to electrode terminals

8. Place cell cap over electrodes

9. Turn on power pack

 

APURE35 Installation

Installation and Operation Manual for APURE35 (5.2 MB)

1. Mount power pack to wall bracket

2. Wire power pack to pool's sub panel

3. Drill holes into pipe

4. Connect locking clamps

5. Attach electrode bell to clamp

6. Place and tighten locking ring

7. Attach color-coded cell leads to electrode terminals

8. Place cell cap over electrodes

9. Turn on power pack